|
House at Huckleberry Hill |
We haven't talked much about the house other than little comments here and there. Following is a list of some of the more negative aspects of the house that we are either planning to fix (or have fixed) or learning to live with:
- We hoped not to have such close neighbors
- Lots of spiders
- Roof was covered in moss and not salvageable. It caused some damage to the inside of the house due to leaking.
- Dogs had run rampant in the house
- House was filthy
- House slopes a little to the back - not from slipping or settling it seems. They just didn't do a great job building on the back part of the house.
- Plumbing, plumbing and more plumbing
- Several windows were out and boarded up including the French doors
- Deck was rotten and falling down
- All the floors need to be redone and lots of new sheet rock put in
We've included some pictures of the house for this post.
|
Note the moss covered roof and the beginning of the debris pile from the inside of the house |
|
French doors - We found fabulous new (to us) doors on Craigs List. We'll show them on another posting. |
|
|
|
|
Just some of the dirt and uck that was on the walls when we first arrived |
|
My dad and Rich working on the bathroom - plumbing, plumbing and more plumbing |
|
View from the bottom of the property when we first arrived |
|
View after Rich pruned terribly overgrown laurel. |
We will be posting some pictures of the work that has been done shortly.
I had to include the following pictures of the maple trees leaves. They are beautiful this time of year.
|
Fall scene at Huckleberry Hill
|
|
Big Leaf Maples |
No comments:
Post a Comment